Zhejiang Qike Catalyst Platinum-Palladium-Rhodium-Ruthenium-Osmium Comprehensive Recovery Project in China

The project is located in Qike, Zhejiang Province, with an annual processing capacity of 15,000 tons of waste catalysts, including 9,000t/a of waste automobile exhaust gas purification catalysts and 1,000t/a of other waste catalysts containing precious metals

Product Description

Zhejiang Qike Catalyst Platinum-Palladium-Rhodium-Ruthenium-Osmium Comprehensive Recovery Project in China

Free Contact

The company's main business: silver electrolysis unit, gold electrolysis unit, nitrogen oxide waste gas treatment system equipment, platinum, palladium and rhodium refining and purification production and other common equipment

Zhejiang Qico Catalyst Recovery Project in China
Company background.
Zhejiang Qike Biotechnology Co., Ltd. is a scientific and technological enterprise specialized in the research, development and production of precious metal catalysts. The company relies on the strong scientific research and development power and first-class scientific research instruments of Zhejiang University of Technology, the unique solvent-free catalysts, the products can be recycled many times. We have successfully developed dozens of loaded precious metal catalysts, the main products are palladium carbon catalyst, palladium alumina catalyst, platinum carbon catalyst, platinum alumina catalyst, ruthenium carbon catalyst, rhodium carbon catalyst, iridium carbon catalyst and other precious metal catalyst products. The products are widely used in the catalytic organic synthesis of fine chemicals in many fields such as pharmaceuticals, pesticides, dyestuffs, spices, liquid crystals and exhaust gas treatment and other industries.
At the same time, the company is qualified to recycle various types of waste platinum group metal catalysts, silver waste catalysts, gold waste catalysts and three-way catalysts containing precious metal hazardous waste.
Project Name.
Zhejiang Qike Catalyst Comprehensive Recycling Project
Raw material.
Recovered catalysts
Process Principle.
The project is located in Qike, Zhejiang Province, with an annual processing capacity of 15,000 tons of waste catalysts, including 9,000t/a of waste automobile exhaust gas purification catalysts and 1,000t/a of other waste catalysts containing precious metals, from which precious metals are extracted. The annual output is 16.5 tons of palladium, 4 tons of platinum, 1784 kg of rhodium, 77.5 kg of iridium, 200 kg of pure iridium, 748 kg of gold, 2449 kg of ruthenium trichloride, and the supporting waste gas treatment equipment for the whole plant.
Construction progress.

Contact Us

Related Products

Copper oxide ore processing

Copper oxide ore processing Efficient Resource Extraction: Electrodeposition efficiently extracts copper from oxide ores, maximizing resource utilization through electrochemical reduction. High-Purity Output: The process yields high-purity copper products, meeting industry

Read More »

How to purify silver

Silver refining is a critical process, and electrolytic purification stands out as an efficient and scientific method. In the process of electrolytic purification, silver serves as the anode in a

Read More »

Electrolytic gold extraction machine

Details of electrolytic gold extraction machine 1. Function introduction: The electrolytic gold extraction machine is a technology for wet refining and purification of metals. It can selectively electrolyze valuable metals

Read More »
Translate »