Nitrogen oxide waste gas treatment project.
This project was put into operation in October 2020, and it will treat the nitrogen oxide waste gas, nitric acid
Perfect Process Technology
This project was put into operation in October 2020, and it will treat the nitrogen oxide waste gas, nitric acid
The project contract was signed on May 21, 2020, and it will be put into operation in July 2020, and
This project is for the treatment of waste gas produced by the precious metal workshop of Yantai Jinao Environmental Protection
The project was officially put into operation in May 2021, and is used to treat the high-concentration nitrogen oxide waste
When platinum group metal concentrates are separated and refined, many of them are produced as AgCl residues. Heavy non-ferrous metal
In November 2019, the company signed a palladium refining and waste gas treatment contract with Shanghai Yaohua Platinum Products Co.,
This project was officially put into operation in March 2019. It is used to treat the nitrogen oxide waste gas
This project was put into operation in April 2020. It is used to treat high-concentration nitrogen oxides produced by the
This project is for the production of silver electrolysis, high-purity copper and tellurium and supporting waste gas treatment for Huanggang
This project has designed 3 silver electrolytic units with a daily output of 300kg/d and one 1500kg/d non-residue silver electrolytic
This project was formally put into operation in April 2021, and is used to treat the tail gas of silver
Gold, silver, platinum, palladium, rhodium refining and precious metal electrolysis project The business scope of our Zhengzhou Jinquan's cooperative customer